Active Transportation Master Plan
Georgina is developing an Active Transportation Master Plan to guide long-term investments in safe, connected and accessible walking, cycling and mobility infrastructure.
Georgina is developing an Active Transportation Master Plan to guide long-term investments in safe, connected and accessible walking, cycling and mobility infrastructure.
Drainage work is underway on Alice Avenue and Boyers Road.
Discover the Civic Centre’s journey from a 1958 novitiate to its years as the administrative centre of Georgina’s municipal government.
High Street’s major upgrades will add new water, stormwater, roads, and streetscaping, building the foundation for Sutton’s downtown as a vibrant local destination.
Holmes Point Park Playground is being upgraded with new accessible play equipment, improved access and inclusive features for children ages 5–12.
Georgina is creating an integrated water, wastewater and stormwater master plan to meet regulatory requirements, support future growth, and build climate resilience.
Transforming a small parkette into a vibrant community space with accessible pathways, open green areas, refreshed landscaping, and upgraded lighting and signage.
Seasonal improvements return to Lake Drive in May 2026 with a multi-use pathway and one-way traffic designed to improve safety and connectivity along the lakeshore.
Georgina is installing a stone revetment along Lake Drive North to stabilize the shoreline, prevent erosion and protect the road from long-term damage.
The Town of Georgina is collecting feedback from residents on Lancaster Court to better understand day‑to‑day parking needs, challenges and observations.
Georgina is replacing the Old Shiloh Bridge near Udora with a new two-lane structure to improve safety and reliability, with construction planned for 2026–2027.
The Town is preparing a Parks Master Plan to guide park investments and identify trends to ensure funding supports parks and recreation needs.
Georgina is replacing an aging cast iron watermain on Queensway South to improve reliability, reduce breaks and support modern water service needs.
Georgina is replacing the aging 1958 Civic Centre with a modern, accessible facility that meets AODA standards and addresses health, safety and operational needs.
Diesel generator fuel systems and other facilities will be upgraded at various sewage pump stations throughout Georgina.
Drainage work is underway on Station Road from Old Homestead Road to Pefferlaw Road. A path/sidewalk is also being built on Old Homestead Road to Station Road.
Town assumed roads in the Estonian Summer Homes and Kova subdivisions in Udora in 2021. Design for all-season gravel upgrades underway; phased work starts 2025–26.
Willow Beach is being revitalized with a new lakefront promenade, widened beach, and people-first streets that will connect green space to the water and people to nature.
Have questions or want to learn more about a project, contact us below:
| Phone | 905-476-4301 / 705-437-2210 |
|---|---|
| info@georgina.ca | |
| Website | georgina.ca |