News

October 2024

10 October 2024

The engineering design stage of the Queensway Watermain replacement project began in October 2024. The following briefly describes key aspects of the project:

Background

  • The objectives of the project include:
    • Replacement of existing watermain
    • Assess existing water valve chambers to determine rehabilitation needs
  • In September 2024, EXP Services was awarded the engineering assignment for the project.
  • The main elements of the design phase of the engineering assignment include: investigations, preliminary design, detailed design and tendering.

Current status

  • Design contract awarded to consultant
  • Initial kickoff meeting

Next steps

  • Background information review
  • Field investigations are planned to start and will include:
    • Surveying
    • Identification and clearance of all underground utilities
    • Geotechnical drilling investigations