The engineering design stage of the project began in fall 2024. The following briefly describes key aspects of the project:

Current status

  • The project kick-off meeting occurred in September 2024
  • Investigations will occur between October and December 2024 including:
    • Topographic and legal surveys
    • Environmental surveys (tree assessment, fish habitat, etc.)
    • Geotechnical investigation

Next steps

  • Complete field investigations
  • Begin the preliminary design
  • Begin the pre-qualification for approved design-build contractors.